MMK48103 Material for Energy and Environmental Sustainability Sustainable Energy Systems and Waste Recycling
| University | universiti malaysia perlis ( UMP) |
| Subject | MMK48103 MATERIAL FOR ENERGY AND ENVIRONMENTAL SUSTAINABILITY |
Appendix A
Topic for Project
1. Solar Panel
(a) Solar panel angle
(b) Light source
2. Wind Turbine
(a) Load characteristic
(b) Material for propeller
(c) Design for propeller
3. Thermal Solar Panel Efficiency
4. Life Cycle Assessment (LCA)
5. Energy Audit
(a) Residential premise
(b) Commercial premise
6. Recycling
(a) Polymer
(b) Metal
(c) Ceramic
(d) Organic waste
Appendix B
Format for Report
1. Your report should have the following:
• Objective/Aim – minimum TWO (2) and maximum THREE (3)
• Introduction/Background of project
• Methodology/Procedure/Framework in conducting your project.
• Result/Discussion/Analysis
• Conclusion and recommendation
2. Number of pages: More than 5 and less than 20 (excluding front cover page).
3. Font: Times New Roman
4. Font size: 12
5. Spacing: 1.5 (Justify)
6. Language: English
7. Due date for submission: 2nd February 2025 (Week 16) – Upload in MMK48103 Elearning (TBC)
Format for Presentation
1. Your presentation (PowerPoint slides or etc.) should have the followings:
• Objective/Aim
• Introduction/Background of project
• Methodology/Procedure/Framework in conducting you project
• Result/Discussion/Analysis
• Conclusion and recommendation
2. Duration: 20 minutes (including Q&A session) for each group.
3. Language: English
4. Presentation date: 20th – 26th January 2025 (Week 15) – TBC
Appendix D
Rubric for Report
Total Mark=20%

Recent Solved Questions
- TAX667: Advanced Taxation Assignment, UTM, Malaysia If the company is not eligible for tax incentives, students may offer suggestions on how the company
- BBBL2074: Business and Corporate Law Assignment, TARC, Malaysia Olive Foods Sdn. Bhd. is a relatively small company incorporated in Malaysia having its business premises in Rawang
- STA404: Statistics for Business and Social Sciences Assignment, UiTM, Malaysia A random sample of employees was selected from three different types of stores at the mall and their ages were recorded
- Suppose the PDA P = (Q= {go, q1}, Σ={0,1}, r={Zo, X}, &, qo, z=Zo, F={q1} ) has the following transition function: Automata theory, Assignment, UMS, Malaysia
- MGT6211E: You are required to analyze the case study “Boeing faces scrutiny regarding: business ethics & law Assignment, IIU, Malaysia
- DMT5023: Statistical Analysis Assignment, MSU, Malaysia Develop an SPSS data set based on Table 1 with a minimum of 100 responses
- Business Ethics Assignment, CU, Malaysia Offering a bribe is wrong because it is an inducement to act dishonestly, disregard one’s duties, and betray a trust
- MPHR7113 Assignment 1: Marketing Management IKEA Malaysia Retention Strategy – City University Malaysia
- Fluid Mechanics Assignment, UPM, Malaysia A water pump is used to pump water at temperature T, with a minimum flow rate of 100 L/min from one large reservoir
- MOM705: Operations Management Assignment, AeU, Malaysia Ali makes ping-pong balls in his Malaysia plant. With recent increases in his costs, he has a newfound interest