Environmental Science Assignment, UON, Malaysia Enzim E memangkin hidrolisis substrat S Kinetik E (V0) sebagai satu fungsi S diukur dan data diperoleh seperti dalam Jadual
| University | University of Nottingham (UON) |
| Subject | Environmental Science |
1. Enzim E memangkin hidrolisis substrat S. Kinetik E (V0) sebagai satu fungsi S diukur dan data diperoleh seperti dalam Jadual 1. Enzim mematuhi kinetik
Michaelis-Menten, yang diberi melalui persamaan berikut: [The enzyme E catalyzes the hydrolysis of substrate S. The kinetics of E (V0) as a function of S were measured and the data were obtained as in Table 1. The enzyme obeys Michaelis-Menten kinetics, which is given by the following equation:]

yang mana Vmax ialah kadar maksimum tindakbalas dan KM ialah pemalar
Michaelis-Menten. [where Vmax is the maximum reaction rate and KM is the Michaelis-Menten constant.]
a) Plot data menggunakan angka salingan berganda (Lineweaver-Burk).
[Plot the data using the double reciprocal (Lineweaver-Burk).]
b) Tentukan Vmax dan KM daripada graf anda.
Recent Solved Questions
- LAW523: Finance Law Essay, CSU, Malaysia Lisbon was charged with murder under section 302 of the Penal Code for killing 16 years old student identified as Paris
- Managing People and Organisational Behaviour Assignment, UiTM, Malaysia Prior to the Covid-19 pandemic, organizations had already been pressured by fluctuations in oil prices
- Professional Engineering Techniques Home Work, APU, Malaysia Calculate the shortest payback period for the project investment shown in Table 1. Which project has a better investment
- AACS3064: Computer Systems Architecture TARC, Malaysia Suggest an application program/system which includes arithmetic computations from any one of the following industries/system
- The following are financial summary of Gemar Bhd: Financial Management, Case Study, UTM, Malaysia
- BCI1103: Demonstrate the principles and concept of computer programming: Computer programming Assignment, SU, Malaysia
- BBPR2103 External Recruitment Assignment: Case Study on HR Strategy at Organisation
- GMGT5173 Organisational Behaviour Assignment Malaysia
- Bachelor of Engineering Chemical-Gas Report, APU, Malaysia Develop a gas pipeline system for a location consisting of at least residential units and commercial lots
- Economics Assignment, UMS, Malaysia Malaysia’s national debt to gross domestic product (GDP) ratio is at a worrying high of 63.8%. In your opinion, what should the Malaysian