Advanced process integration Assignment, CU, Malaysia Determine the minimum fresh water and minimum wastewater targets for the above system using water cascade analysis
| University | Curtin University (CU) |
| Subject | Advanced process integration |
Task A: Wastewater in acrylonitrile production Figure 1 shows a process flow diagram for ‘ 1^ AN is produced in a fluidized-bed reactor via vapor-phase ammoxidation of propylene. The reaction is a single pass, with an almost complete conversion of propylene. The reactor is operated at 2 atm and 450°C, with the stoichiometry shown in the below equation.


Task A-1 Determine the minimum fresh water and minimum wastewater targets for the above system using water cascade analysis (WCA). [35%]
Task A-2 [UL02] Based on the results obtained from Task A-1, redraw Figure 1 for this acrylonitrile production. [5%]
Task A-3 (ULO1] Identify and explain two mass exchange techniques that can be used to separate water from the aqueous layer. Make a comparison between these two techniques and identify the better technique for water separation. [15%]
Recent Solved Questions
- GSGM 7234: Strategic Human Resource Management – Final Assessment January 2025
- MPU2192 FALSAFAH DAN ISU SEMASA Case Study Assignment 2026 | OUM
- PPB3033 Semester A241 Case Study: Zoo Negara Malaysia Universiti Malaya
- Identify a conflict on the theme of change that is explored in the novel: Malaysian Popular Literature and Culture Assignment, UNM, Malaysia
- FIN30014: Financial Risk Management Case Study, SUT, Malaysia Industrial commodities in China mostly rose as the number of Covid-19 cases fell and the government began to loosen the restrictions
- Advanced Strategic Management Case Study, ASB, Malaysia After many years that’s the Holy Grail that we’re finally starting to get traction on. We recognized in the 1990s that design
- STA60104 Quantitative Methods for Business Assignment Malaysia
- Choose a company you work for or any company of your liking or a specific product: Sustainability and Business, Assignment, MUM, Malaysia
- GSGM7334 CRM Software Project Assignment: TechWave Solutions Case Study for RetailPro Integration and Risk Management
- MPHR7113 Assignment: Strategic HR Analysis of Golden Heritage Café (HRM)