Land Surveying Assignment, UGM, Malaysia The junctions of the square grid shown above were levels taken to determine the volume of excavation necessary
University | Universiti Geomatika Malaysia (UGM) |
Subject | Land Surveying |
The junctions of the square grid shown above were levels taken to determine the volume of excavation necessary to flatten the area PQRS to a required level of 70.25m. The horizontal distance between grid points is 30m.
A road is needed to link the area PQRS to an existing road. The survey was carried out starting from point D7 and the centre line of the proposed road is perpendicular to RS with marks planted 30m apart along the centre line with the last distance of 35.20m to the edge of the existing road. Levels were taken to the centre marks and also 15m on either side of the centre marks with the levels as shown in the diagram above.
a) Plot the survey (area PQRS and the proposed road) at a scale of 1:2000 and CALCULATE the volume of cut within the area PQRS.
b) Plot the longitudinal section of the existing surface of the proposed road starting from D7 to the Edge of the Existing Road.
If the proposed road has a falling gradient of 1:25 starting at D7, calculate the cut or fill at each of the 30m marks along the centre line of the proposed road if the formation level of the road at D7 is 70.25.
Get Help By Expert
Assignmenthelper.my is your go-to source for top-quality Malaysian homework help. We understand that students are often swamped with multiple assignments, and it can be challenging to complete them on time. That's why we have a team of experienced and highly qualified assignment helper Malaysia who are available to provide 24/7 assistance to help you complete your homework.
Recent Solved Questions
- Fundamental of Integrated Marketing Communication Case Study, UUM, Malaysia With an average annual growth rate of 11.2% over the past twelve years, tourism has been integral to the economy
- Analyse the financial statements of the company through following sub-headings: Accounting, Assignment 1, WOU, Malaysia
- To describe the basic features of the technologies and their potential applications: Contruction Project Management Research Paper, Malaysia
- You plan to open a Malay restaurant specializing in serving Bandar Baru Bangi and Kajang traditional food: Production and Operation Management Assignment, OUM, Malaysia
- Organizational Behavior Assignment, TU, Malaysia Authentic leaders lead from strong, personal, moral values that can have a profound effect on your organization
- Human Resource Management Essay, AeU, Malaysia What are the different conceptual approaches International Human Resource Management (HRM) takes when examining HRM
- MX3536: Differential Equations Assignment, UTM, Malaysia Concider the heat equation with boundary conditions and initial conditions
- Project Management Research Paper, CU, Malaysia Loyalty is one of the greatest intangible assets that any organization can possess and improving client loyalty
- GEO ENGINEERING Essay, UITM, Malaysia Evaluate the role of Ocean fertilization in addressing climate change In the introduction briefly explain climate change and ocean fertilization
- Toshiba, a 140-year-old pillar of Japan Inc, is caught up in the country’s biggest accounting scandal: Audit And Assurance Service Essay, UUM, Malaysia