Energy Fuel and Power Technology Division Assignment, UON, Malaysia You have been assigned to conduct an evaluation of the bioenergy opportunity by selecting ONE source of biomass
University | University of Nottingham (UON) |
Subject | Energy Fuel and Power Technology Division |
Task: You have been assigned to conduct an evaluation of the bioenergy opportunity by selecting ONE source of biomass/bioenergy resources. To do this, you have to complete the two main parts namely Resource Potential Analysis and Market Analysis.
Part 1: Resource Potential Analysis
The development and scale-up of any bioenergy project begin with an analysis of the resource potential. There are three types of biomass resource potential: theoretical, technical, and economic.
i. Theoretical: Illustrates the ultimate resource potential based on calculations of all existing biomass, with no constraints on access or cost-effectiveness.
ii. Technical: Limits the theoretical resource potential by accounting for terrain limitations, land use and environmental considerations, collection inefficiencies, and a number of other technical and social constraints. This type of potential is also called accessible biomass resource potential.
iii. Economic: Economic parameters are applied to the technical resource potential, which results in a subset of the technical potential along with an estimate of the cost of biomass resources either at the field or forest edge. The final outcome of this type of assessment is a supply curve (RM/tonne).
Using any (one) of Biomass Resource Assessment Tools and Studies, perform the Resource Potential Analysis for biomass of your interest. (You can use this link as one of the references Bioenergy Assessment Toolkit (nrel.gov). Keep your evaluation as brief as possible. You can estimate with some justifications, in case there is no data made available for your selected biomass/bioenergy resources.
Part 2: Market Analysis
Analyzing the existing and potential markets for biomass resources, along with barriers, is critical when planning a bioenergy program. A thorough understanding of the market size, growth, regional segmentation, and trends relies on many different inputs such as:
i) State of technology and the country’s experience with each technology
ii) Production cost estimated
iii) Socio-economic and environmental impacts of biomass production
iv) Policy framework in support of the biomass industry
v) Trade opportunities.
Get Solution of this Assessment. Hire Experts to solve this assignment for you Before Deadline.
Recent Solved Questions
- To examine the teachers’ perceptions of the school principal’s leadership qualities: Sustainability and Business, Assignment, MUM, Malaysia
- MPU3123: Islamic Civilization and Asian Civilization Assignment, AeU, Malaysia Kerajaan Islam zaman Abbasiyyah telah membawa perubahan yang besar dalam pelbagai aspek seperti perubatan
- CES3013: Social and Current Issues in Computing Assignment, UOW, Malaysia Evaluate the implications of social and ethical issues in the development of information systems. Demonstrate awareness of the nature
- BBCA1033 Introduction to Accounting Assignment, CUM, Malaysia
- AC4012: Introduction to Financial Accounting Report, SC, Malaysia You are required to choose TWO listed companies from Bursa Malaysia with the annual report from 2014 onwards
- EED308: Briefly explain the need for 21st century skills in today’s world: English Language Teaching In Malaysia Assignment, WOU, Malaysia
- Discuss on how character education in the future 2027 school curriculum in Malaysia: Foundations Of Educations Assignment, UNM, Malaysia
- Determine the payback period for both Project ABC and Project XYZ: Managerial Accounting Assignment, UPNM, Malaysia
- BBMF 3073: Risk Management Assignment, UTAR, Malaysia Risk Management analysis is the discipline of identifying business risk and determining solutions to business risk
- DBAF2003: Principles of Accounting Assignment, UoC, Malaysia On 1 January 2011, Yen had two vehicles for use in his business. Vehicle X was bought several years earlier for £7.500