GSGM7334: Serbaneka Toy Company- Kamal, the Project Manager at Serbaneka Toy Company (Serbaneka), had just submitted a proposal for additional funding to the new product review committee: Project Management, Case Study, UNITAR, Malaysia
| University | UNITAR International University (UIU) |
Serbaneka Toy Company
Kamal, the Project Manager at Serbaneka Toy Company (Serbaneka), had just submitted a proposal for additional funding to the new product review committee. He recommended that Serbaneka introduce, through its retail distribution network, a new children’s game based on the popular cartoon characters Upin & Ipin.
Kamal felt that if he could get the game out in the market before Hari Raya Puasa, Serbaneka could take full advantage of what he felt would be a strong market demand. He estimated that the sales for these types of games could reach up to RM 200,000. However, due to the volatility of the market for these types of games, Kamal could not be certain that the product would have the same level of market acceptance the next year. It was now May 6, 2023, and Kamal knew he would have to manage the timing of the project carefully in order to meet the deadline for delivery of September 15th, 2023 which was just 19 weeks away.
Serbaneka’s head office was in Kajang, Selangor, where it also operated a manufacturing plant and distribution centre. Whenever possible, Serbaneka preferred to manufacture its products in-house.
Kamal expected feedback from the new product review committee at the end of the week, at which time he would begin coordinating the launch of the project. Since Kamal was an experienced project manager, he established a preliminary schedule of activities, as shown in Exhibit 1 below.
Based on this schedule, Kamal felt he could start work on some activities immediately, such as finalizing the product design and placing an order for the equipment. However, many of the activities had to be performed sequentially. For example, he could not train the workers until the equipment was installed and the tools for the machine were completed. Similarly, he could not order the raw materials until the engineering work was completed and the advertising plan was completed since the advertising plan would influence the ultimate colour selection.
Concerned about the delivery schedule, Kamal investigated opportunities to cut the project time. After talking with the marketing manager, Cik Siti, Kamal learned that he could reduce the cost of product advertising. Cik Siti anticipated only a small 1% reduction in sales for each week of lost advertising. However, Cik Siti indicated that Kamal needed at least six weeks of advertising for a new product of this nature.
Kamal also spoke with Shahrul, the production manager at the tool shop. Shahrul offered to speed up the tool building by working on two consecutive weekends, for an additional cost of RM10,000. Shahrul thought he could improve their delivery time by two weeks if Kamal authorized this additional cost.
Questions:
1. Prepare the network diagram for the above project. How long will it take to complete the project?
2. Establish the ‘float’ or ‘slack’ times for each activity.
3. Based on the information in the case study, evaluate the options Kamal has to meet the September 15th deadline. What is your recommendation?
Get Help By Expert
Are you struggling with your GSGM7334: Project Management case study? Our online assignment helpers services are here to assist Malaysian students. Our team of experienced assignment experts offers personalized guidance and support tailored to your coursework needs. Whether you need help with case studies or management assignments, we're ready to help you achieve academic success. Contact us today to make your assignment challenges a thing of the past.
Recent Solved Questions
- UNIM513: Research Methodology Assignment, UTN, Malaysia Design quantitative, qualitative, and mixed methods approach research
- Researcher Competence Report, UMS, Malaysia How can quantitative research methods be used to evaluate the effectiveness of teacher training programs
- Islamic Finance Products and Service Assignment, UCSI, Malaysia Explain the term shariah compliant stock. How many countries have these I-stocks? Name these countries
- CHEN5017: Process Plant Engineering Assignment, CU, Malaysia Hydrogen is touted to be one of the most promising energy carriers which can supply the world’s energy demand .
- TEE103: i. Calculate the voltage Vs, by using Kirchhoff’s law and Ohm’s.: Circuit Theory I Assignment, WOU, Malaysia
- Corporate Law Assignment, VUC, Malaysia Explain whether a third party is required to have constructive notice of the contents or requirements of a company’s
- CSC404: Programming II Assignment, UiTM, Malaysia UiTM Johor will organize an Active Learning Workshop among lecturers from UiTM and other universities in Malaysia
- Fluid Mechanics Assignment, UPM, Malaysia A water pump is used to pump water at temperature T, with a minimum flow rate of 100 L/min from one large reservoir
- FIN30014: Financial Risk Management Case Study, SUT, Malaysia Identify ONE financial risk faced by Alphabet Inc given the above scenario Systematically review and critically evaluate research from a variety
- Introduction to Statistic Assignment, UiTM, Malaysia Sabah Electricity Sdn Bhd in Kota Kinabalu is conducting a survey to find out the average monthly consumption of electricity