BQS601 Measurement of Construction Works V Assignment 1 2026 | UiTM

University Universiti Teknologi MARA (UiTM)
Subject BQS601 Measurement of Construction Works V

UNIVERSITI TEKNOLOGI MARA

BQS601 – MEASUREMENT OF CONSTRUCTION WORKS V

ASSIGNMENT NO: 1

TOPIC: SURFACE WATER DRAINAGE – OPEN DRAIN
LECTURER: MOHAMMAD NASHARUDINE SHUIB

NO. | NAME | STUDENT ID

  1. KAMARULAIMAN BIN M RAYMI – 2018223944

  2. NORAZIEYZAH BINTI ABDULLAH – 2018250846

  3. NURARINA AMNI BINTI MOHD AZIZI – 2018249062

  4. NURFATINI BINTI TAJUDDIN – 2018297712

PROGRAM: UKUR BAHAN
FACULTY: SENIBINA, PERANCANGAN DAN UKUR
UNIVERSITI TEKNOLOGI MARA

TAKING-OFF PAPER

PROJECT: PROPOSED CONSTRUCTION OF DEWAN SERBANGUNA AT LOT PT103, PELABUHAN KLANG, SELANGOR
DRWG. NO: PUB/QSM601/QSB621/JUL2017/1 DATE: 8/11/…

Item Description – Taking-off List:

  1. Excavate trench to receive surface water drains, etc.

  2. Extra for excavation trench in rock

  3. Disposal of water

  4. Concrete blinding

  5. Concrete bed

  6. 225mm thick brick wall

  7. 20mm thick plastering to drain wall

  8. 600 x 900 x 50mm thick precast concrete slab cover

  9. Graded filter & UPVC Weepholes

  10. 375 x 450 x 200mm thick precast concrete block drain

  11. Connection to existing main drain

  12. Testing

Direct Billing Paper – Element: Surface Water Drainage:

  • Excavate trench to receive surface water drains (m³)
  • Extra over excavate in rock (m³)
  • Allow for keeping surface & excavations free of water (Item)
  • 900mm wide x 50mm thick lean concrete (m)
  • Plain in-situ concrete bed (m)
  • 225mm thick brick wall (m²)
  • 20mm thick cement & sand plaster (m²)
  • Precast concrete block drains and slab covers (m)
  • Graded filter (No.)
  • Connection to existing drain (Item)
    Testing (Item)

Further Items on Next Page: Continued bill of quantities for precast drains, filters, slab covers, connections and testing.

BQS601 Measurement of Construction Works V Assignment 1 2026 | UiTM

Need Help with BQS601 Measurement of Construction Works V?

Get Help By Expert

BQS601 Measurement of Construction Works assignments require strong understanding of taking-off, BOQ preparation, and measurement rules, which many UiTM students find tricky. Preparing accurate quantities for surface water drainage items like excavation, concrete works, brickwork, and precast drains takes time and practice. If you are looking for Quantity Surveying Assignment Help Malaysia that follows UiTM standards, Assignment Helper Malaysia provides structured academic support. All work is human-written, AI-free, and plagiarism-free, and students can also check sample assignments to see the quality and accuracy of our measurement work.

Answer

Recent Solved Questions

Online Exam & Assignment Writing Services
Orders

70841+ Orders Delivered

Star Rating

4.9/5
5 Star Rating

Confidential & Secure Assignment Help For

Group Assignment Help

Online Exam -Test & Quiz

Cheapest Price Quote

Diploma & Certificate Levels

Semester & FYP Papers

Summative & Individual

GBA & Reflective

Last Minute Assistance

Sample Assignment Download

BIO330 Introduction To Ecology UITM Assignment Answer Malaysia
BIO330 Introduction to Ecology is a course offered at UITM in Malaysia. The course explores biological concepts and interactions in population, community, and ecosystem ecology. It also covers environmental issues,…
Science
FIN552 Investment And Portfolio Analysis UITM Assignment Answers Malaysia
FIN552 Investment And Portfolio Analysis is a top-ranked investment and portfolio management course offered by the Financial Times. The course provides an overview of different asset classes and investment strategies…
Finance

UP TO 15 % DISCOUNT

Instant Paper Writing Services by Native Malaysia Writers

Plagiarism Free Solutions
100% Original Work
24*7 Online Assistance
Native PhD Experts
Hire a Writer Now

Facing Issues with Assignments? Talk to Our Experts Now! Download Our App Now!