BPA31803 Project Management Assignment Malaysia

University Universiti Tun Hussein Onn Malaysia (UTHM)
Subject BPA31803 Project Management

Individual Assignment (10%)

CLO2: Demonstrate project management workflow that can be applied to effectively execute organizational plans. (Practical skill)

You have been assigned by the General Manager to lead a project aimed at increasing factory production capacity from 100K/Month to 200K/Month. The project is to be completed within 6 months, with a budget of RM3 Million. As the Project Manager, you will need to form an imaginary team consisting of the following roles:

  • Manufacturing Supervisor
  • Material Analyst
  • Production Planner
  • Equipment Maintenance Manager
  • Procurement Officer
  • Industrial Engineer
  • Human Resource Officer
  • Training Officer
  • Finance Officer

Report Requirements:

The project report should be created in MS Word format using Arial font size 12 and single spacing. The report must be between 7 to 10 pages, excluding the cover page.

Are You Searching Answer of this Question?

Request Malaysian writers to write a plagiarism-free copy tailored to your question.

Key Components of the Report:

  1. Company and Project Background, Overview, and Objectives (10% marks)
    • Provide a clear background of the company and the project.
    • State the objectives of increasing production capacity and the steps needed to achieve the goal.
  2. Roles of Each Team Member (5% marks)
    • Describe the roles and responsibilities of each team member in the project.
  3. Action Plans and Project Schedule (25% marks)
    • Conduct a meeting to discuss action plans with each team member to enable the factory to increase production capacity.
    • Capture 1 to 3 action plans from each team member.
    • Develop a project schedule in table format, including the following:
      • Project goal.
      • Action plans.
      • Task completion timelines (start and end date).
      • Person in charge of each task.
  4. Gantt Chart Format (10% marks)
    • Illustrate the project schedule using a Gantt Chart format, clearly showing the timeline for each action plan.
  5. Project Costing Plan (20% marks)
    • Develop a detailed costing plan, breaking down the RM3 Million budget and specifying the allocation for each area of the project.
  6. Potential Risks and Mitigation Plan (20% marks)
    • Discuss 5 potential risks that could affect the success of the project and provide a mitigation plan for each risk.
  7. Project Summary and Conclusion (5% marks)
    • Summarize the project and conclude with key points about the project’s success and its future impact.
  8. Creative and Attractive Cover Page (5% marks)
    • Design a creative and professional cover page for the report.

Stuck in Completing this Assignment and feeling stressed ?

Take advantage of our private writing services and get help from professionals.

Related Questions

🔥 PLACE AN ORDER NOW

Don't Miss The Limited 5% Discount