BQS601 Measurement of Construction Works V Assignment 1 2026 | UiTM
| University | Universiti Teknologi MARA (UiTM) |
| Subject | BQS601 Measurement of Construction Works V |
UNIVERSITI TEKNOLOGI MARA
BQS601 – MEASUREMENT OF CONSTRUCTION WORKS V
ASSIGNMENT NO: 1
TOPIC: SURFACE WATER DRAINAGE – OPEN DRAIN
LECTURER: MOHAMMAD NASHARUDINE SHUIB
NO. | NAME | STUDENT ID
-
KAMARULAIMAN BIN M RAYMI – 2018223944
-
NORAZIEYZAH BINTI ABDULLAH – 2018250846
-
NURARINA AMNI BINTI MOHD AZIZI – 2018249062
-
NURFATINI BINTI TAJUDDIN – 2018297712
PROGRAM: UKUR BAHAN
FACULTY: SENIBINA, PERANCANGAN DAN UKUR
UNIVERSITI TEKNOLOGI MARA
TAKING-OFF PAPER
PROJECT: PROPOSED CONSTRUCTION OF DEWAN SERBANGUNA AT LOT PT103, PELABUHAN KLANG, SELANGOR
DRWG. NO: PUB/QSM601/QSB621/JUL2017/1 DATE: 8/11/…
Item Description – Taking-off List:
-
Excavate trench to receive surface water drains, etc.
-
Extra for excavation trench in rock
-
Disposal of water
-
Concrete blinding
-
Concrete bed
-
225mm thick brick wall
-
20mm thick plastering to drain wall
-
600 x 900 x 50mm thick precast concrete slab cover
-
Graded filter & UPVC Weepholes
-
375 x 450 x 200mm thick precast concrete block drain
-
Connection to existing main drain
-
Testing
Direct Billing Paper – Element: Surface Water Drainage:
- Excavate trench to receive surface water drains (m³)
- Extra over excavate in rock (m³)
- Allow for keeping surface & excavations free of water (Item)
- 900mm wide x 50mm thick lean concrete (m)
- Plain in-situ concrete bed (m)
- 225mm thick brick wall (m²)
- 20mm thick cement & sand plaster (m²)
- Precast concrete block drains and slab covers (m)
- Graded filter (No.)
- Connection to existing drain (Item)
Testing (Item)
Further Items on Next Page: Continued bill of quantities for precast drains, filters, slab covers, connections and testing.

Get Help By Expert
BQS601 Measurement of Construction Works assignments require strong understanding of taking-off, BOQ preparation, and measurement rules, which many UiTM students find tricky. Preparing accurate quantities for surface water drainage items like excavation, concrete works, brickwork, and precast drains takes time and practice. If you are looking for Quantity Surveying Assignment Help Malaysia that follows UiTM standards, Assignment Helper Malaysia provides structured academic support. All work is human-written, AI-free, and plagiarism-free, and students can also check sample assignments to see the quality and accuracy of our measurement work.
Recent Solved Questions
- Data Organization and Management in Daily Life
- UCS422: Your organization is planning to adopt BYOD which allow the employee: Introduction To Cyber Security for Non- Computing Science Assignment, UiTM, Malaysia
- International Marketing Report, IBAS, Malaysia The senior management team has asked you to brief them on the implications of international marketing for organizations
- Information Marketing Assignment, TU, Malaysia An info product is any product that can be digitally created, sold, and transferred to your customer
- Toxicology Essay, UM, Malaysia Explain the dose-response relationship of all toxicants. Which one is more potent? Toxicant A or B
- ACC4304: Auditing Essay, UH, Malaysia Write an essay that critically evaluates the impact of an accounting scandal on auditor independence and audit quality
- Based on the guideline of Kurikulum Standard Prasekolah Kebangsaann (KSPK): Art and craft for young children Assignment, Malaysia
- BFIN2213: Principles of Finance Assignment, UTAR, Malaysia Select a public listed company and prepare an assignment paper on financial issues and strategies adopted by the financial management
- Supply Chain Management Assignment – Optimizing the supply chain of Local Organization/Company
- CT038-3-2-OODJ: Procurement Order Tracking System (POTS)